Civil and earthworks: dockets in, hours billed, plant checked

Operators fill in paper dockets and pre-start checks in the cab, the office types them up at the end of the week, and some hours never get billed. Quotes are worked out from plans with a scale ruler, and machine servicing lives on a whiteboard.

How can AI help a civil or earthworks contractor in Adelaide?

AI turns photos of dockets and timesheets into billable hours against the right job, runs plant pre-starts on a phone with defects sent to the workshop, reads plans into cut, fill and trench quantities for your estimator, and keeps servicing, registrations and operator tickets current. Before-you-dig requests and claims are tracked against each job. Assignar, Varicon or your system stays the record.

Written by Jithendra Varma Chamarthi, who has worked inside Adelaide businesses. Built from current Adelaide job ads, the rules that apply to civil, earthworks, subdivision and plant hire and the software these businesses use.

Who this is for Earthmoving and excavation contractors · Plant hire with operator (wet hire) · Civil contractors for subdivisions, drainage and roads · Land developers and subdivision managers · Contractors across Adelaide, the Hills and regional SA

Where the office day goes

Dockets and plant

Operators and workshop

Done by hand today
  • Paper dockets and timesheets handed in on Friday
  • Pre-start checks ticked on paper in the cab
  • Defects mentioned to the workshop in passing
  • Servicing and registrations tracked on a whiteboard
What a computer could do
  • Docket photos read into hours, machine and job
  • Pre-starts done on a phone, with defects sent to the workshop
  • Defects tracked until the machine is fixed
  • Servicing, rego and inspections reminded by hours and date

Quotes, jobs and claims

Estimator and office

Done by hand today
  • Quantities from plans worked out with a scale ruler
  • Before-you-dig requests made per job and filed
  • Hours missed when dockets go astray
  • Progress claims built from dockets at month end
What a computer could do
  • Plans read into cut, fill and trench quantities to check
  • BYDA requests and responses filed against each job
  • Unbilled hours flagged when a docket is missing
  • Claims drafted from dockets and quantities each month

Typical work in this industry, from current Australian job ads and first-hand experience. Not results from past clients.

From the first email to getting paid

  1. 1 · Quote

    Quantities from plans

    Plans read into cut, fill and trench quantities; your rates applied.

  2. 2 · Plan

    Machines and crews

    Machines, operators and floats allocated; tickets checked.

  3. 3 · Dig

    Services located

    BYDA requests made and responses filed before work starts.

  4. 4 · Work

    Pre-start and dockets

    Pre-starts on a phone; dockets photographed and read.

  5. 5 · Bill

    Every hour billed

    Hours matched to jobs; missing dockets flagged.

  6. 6 · Maintain

    Plant ready

    Defects, servicing and registrations tracked by hours and date.

What changes for each person

WhoTodayWith automation
Owner or managing directorSuspects hours are going unbilledSees hours worked versus billed for every machine
EstimatorMeasures plans by handChecks drafted quantities and prices
Project or site supervisorChases dockets and pre-startsSees which are missing each day
Plant operatorFills paper dockets and checklists in the cabTakes a photo and taps through the pre-start
Workshop or fleet managerHears about defects too lateGets defects with photos and machine hours
Office administratorTypes dockets into invoicesApproves invoices drafted from dockets
Allocator or schedulerJuggles machines, floats and operators by phoneWorks from a board with tickets and availability

What we count on the free call

Before we quote, we measure your week with you. These are the numbers that decide what to build first.

  1. Dockets per week and how many arrive late or missing
  2. Machine hours worked versus billed last month
  3. Defects reported last quarter and days to fix
  4. Hours per quote spent measuring plans

Rules and records to keep on top of

RuleWhat it means for your records
Plant and high risk work licences (SafeWork SA)Operators need the right high risk work licence or competency for each machine, and plant must be inspected and maintained. Keep pre-starts and defects for every machine.
Before You Dig AustraliaRequest underground service locations before any excavation, and keep the response and site checks with the job.
Heavy vehicle rules (NHVR)Floats, tippers and water carts are heavy vehicles under the Heavy Vehicle National Law. Track mass, fatigue for drivers and vehicle maintenance.
Security of Payment (SA)Subcontract civil work is covered by the Security of Payment Act. Make claims on time with dockets and quantities attached, and track when a schedule is due back.
Environmental protection (EPA SA)Earthworks must control dust, sediment and contaminated soil, and fill must be clean or properly classified. Keep soil and fill records with the job.

We build tools that keep records and send reminders. We don't give legal or compliance advice; your team stays responsible for meeting each rule.

Software these shops already use

  • Assignar, Varicon or HCSS
  • SafetyCulture for pre-starts
  • Teletrac Navman or another GPS tracker
  • Before You Dig Australia portal
  • Trimble or 12d for survey and design
  • Xero, MYOB or Jobpac

We connect to these where they allow it. You keep your software.

Start small, one step at a time

StepWhat you getPrice
1. Docket and timesheet readerPhotos of dockets and timesheets read into hours, machine and job, with missing dockets flagged$2,190 + $49/mo
2. Phone pre-starts and defectsPre-start checks on a phone per machine, with defects sent to the workshop and tracked to fixed$1,590 + $29/mo
3. Plan quantity readerPlans read into cut, fill, trench and pipe quantities for the estimator to check and price$2,590 + $29/mo
4. Plant maintenance registerServicing, registrations, inspections and operator tickets reminded by machine hours and date$1,190 + $19/mo
5. Claims from docketsMonthly claims drafted from dockets and quantities, with BYDA and site records attached$1,390 + $19/mo
Everything together

The whole civil and plant system

All 5 steps, built in order and connected to each other, with one monthly care plan for hosting, AI usage and fixes.

$7,590 + $109/moOne by one: $8,950 + $145/mo · you save $1,360

No GST added. Adel AI Studio is a sole trader and is not registered for GST. Pick any step on its own, in any order, or everything together. Each price is fixed in writing. Steps 4 and 5 are paid once they work. Steps 1, 2 and 3 and the whole system take a 30% deposit to book the build, refunded if it does not do what the written quote says, and the rest is due when it goes live. Nothing is sent to a customer until you have checked it, unless you choose otherwise.

Custom work

Something else on your list?

If AI can do it, we can build it for you. Tell us the job in your own words. We’ll tell you honestly whether it’s worth automating, then send a fixed price in writing before any work starts.

Describe your job

How you’ll know it worked

We don’t publish results we can’t show you. Instead, every build for civil contractors is measured on your own numbers.

Your starting point

Before anything is built, we write down where you are today: dockets per week and how many arrive late or missing.

Counted again after 30 days

Thirty days after go-live we measure the same things again, including “Machine hours worked versus billed last month”, and send you the before and after side by side.

Start small

Judge us on one result first. The smallest step, plant maintenance register, is $1,190.

Your money is safe

Every price is fixed in writing before work starts, and any deposit is refunded if the build doesn’t do what the written quote says.

Questions people ask

How much does AI automation cost for civil contractors in Adelaide?

It depends on which parts you need. The five steps range from $1,190 for plant maintenance register to $2,590 for plan quantity reader, and all of them together are $7,590 plus $109 a month for hosting, AI usage and fixes. Each price is fixed in writing, and no GST is added.

What would you build first for civil contractors?

Start with docket reading. Every docket is money, missing ones are lost hours, and the office stops typing on Fridays the first week.

Can it read handwritten dockets?

It reads most handwritten dockets and shows the photo next to what it read. Anything it’s unsure about is highlighted for the office to confirm.

Will operators use a phone pre-start?

Most prefer it to paper: big buttons, a photo for defects, and it takes about a minute. It also works with no reception and sends when back in range.

Does it work for wet hire only?

Yes. Plant hire with operator gets dockets, pre-starts and maintenance, which are where most of the admin is. Skip the quantity reader if you don’t quote from plans.

Does it work with Assignar or Varicon?

It works alongside them through their APIs and exports. If you don’t use one, the docket and pre-start records live in a simple shared register.

Count the repeat work first

A free 30-minute call on a weekday evening or weekend. We count the emails, re-typing and status questions your office handles in a day, then send a fixed price in writing.